Chapter 3
DownloadTélécharger
Actions
Vote :
ScreenshotAperçu

Informations
Catégorie :Category: nCreator TI-Nspire
Auteur Author: gyat012302310
Type : Classeur 3.0.1
Page(s) : 1
Taille Size: 1.42 Ko KB
Mis en ligne Uploaded: 26/02/2025 - 03:46:23
Uploadeur Uploader: gyat012302310 (Profil)
Téléchargements Downloads: 3
Visibilité Visibility: Archive publique
Shortlink : http://ti-pla.net/a4518503
Type : Classeur 3.0.1
Page(s) : 1
Taille Size: 1.42 Ko KB
Mis en ligne Uploaded: 26/02/2025 - 03:46:23
Uploadeur Uploader: gyat012302310 (Profil)
Téléchargements Downloads: 3
Visibilité Visibility: Archive publique
Shortlink : http://ti-pla.net/a4518503
Description
Fichier Nspire généré sur TI-Planet.org.
Compatible OS 3.0 et ultérieurs.
<<
1. Overhead Application Step 1: Estimate Total Overhead Costs Y = a + bX (Total OH = Fixed OH + Variable OH × Activity Level) Step 2: Compute Predetermined Overhead Rate (POHR) POHR = Estimated OH Costs ÷ Estimated Activity Level Step 3: Apply Overhead to Jobs Applied OH = POHR × Actual Activity Level 2. Cost Accumulation Total Job Cost = DM + DL + Applied MOH Average Cost Per Unit = Total Job Cost ÷ Units Produced 3. Over- and Under-Applied Overhead Overapplied OH: Applied > Actual (Decreases COGS). Underapplied OH: Applied < Actual (Increases COGS). 4. Pricing Decisions Markup = Cost × (1 + Markup %) Markup Based on Total Cost (e.g., 130-150% of total cost) Made with nCreator - tiplanet.org
>>
Compatible OS 3.0 et ultérieurs.
<<
1. Overhead Application Step 1: Estimate Total Overhead Costs Y = a + bX (Total OH = Fixed OH + Variable OH × Activity Level) Step 2: Compute Predetermined Overhead Rate (POHR) POHR = Estimated OH Costs ÷ Estimated Activity Level Step 3: Apply Overhead to Jobs Applied OH = POHR × Actual Activity Level 2. Cost Accumulation Total Job Cost = DM + DL + Applied MOH Average Cost Per Unit = Total Job Cost ÷ Units Produced 3. Over- and Under-Applied Overhead Overapplied OH: Applied > Actual (Decreases COGS). Underapplied OH: Applied < Actual (Increases COGS). 4. Pricing Decisions Markup = Cost × (1 + Markup %) Markup Based on Total Cost (e.g., 130-150% of total cost) Made with nCreator - tiplanet.org
>>