sem
DownloadTélécharger
Actions
Vote :
ScreenshotAperçu
Informations
Catégorie :Category: nCreator TI-Nspire
Auteur Author: atramarc
Type : Classeur 3.0.1
Page(s) : 1
Taille Size: 1.58 Ko KB
Mis en ligne Uploaded: 07/11/2024 - 11:36:01
Uploadeur Uploader: atramarc (Profil)
Téléchargements Downloads: 2
Visibilité Visibility: Archive publique
Shortlink : http://ti-pla.net/a4301404
Type : Classeur 3.0.1
Page(s) : 1
Taille Size: 1.58 Ko KB
Mis en ligne Uploaded: 07/11/2024 - 11:36:01
Uploadeur Uploader: atramarc (Profil)
Téléchargements Downloads: 2
Visibilité Visibility: Archive publique
Shortlink : http://ti-pla.net/a4301404
Description
Fichier Nspire généré sur TI-Planet.org.
Compatible OS 3.0 et ultérieurs.
<<
Ferrovial - Net Zero 2050 - 2030 23% redução emissãos GEI 1990 - Energy saving measure: BMS in provement BMS: Building Management Syslens " EPC - Energy performance contract reduce cost improve efficiency " Eaas - Energy as a Service " BiM - Building information modeling Pre zero ESCO-erergy sernces company CC - construction / Instalation Cantract reponsibility is not in the c o n t r a c t o r Caries out work at a price gives wanenty against defects EPC in EPC contracor has responsibility for the performance Bears the costs of investment the time mobilization operation and maintenance Effitech " EVO - Efficioncy Valuation Organization " IPMP- Interntional Performance Measuerunt and Verification Protocol " Performance Ratio Concept : PR = Egen/ GTI.PFV "EEM- Energy efficiency measure Made with nCreator - tiplanet.org
>>
Compatible OS 3.0 et ultérieurs.
<<
Ferrovial - Net Zero 2050 - 2030 23% redução emissãos GEI 1990 - Energy saving measure: BMS in provement BMS: Building Management Syslens " EPC - Energy performance contract reduce cost improve efficiency " Eaas - Energy as a Service " BiM - Building information modeling Pre zero ESCO-erergy sernces company CC - construction / Instalation Cantract reponsibility is not in the c o n t r a c t o r Caries out work at a price gives wanenty against defects EPC in EPC contracor has responsibility for the performance Bears the costs of investment the time mobilization operation and maintenance Effitech " EVO - Efficioncy Valuation Organization " IPMP- Interntional Performance Measuerunt and Verification Protocol " Performance Ratio Concept : PR = Egen/ GTI.PFV "EEM- Energy efficiency measure Made with nCreator - tiplanet.org
>>